Skip to content

Switches 2024 CTAN repo to upstream #50

Switches 2024 CTAN repo to upstream

Switches 2024 CTAN repo to upstream #50

Triggered via push July 4, 2024 12:34
Status Failure
Total duration 1d 5h 7m 55s
Artifacts

build-only.yml

on: push
Matrix: build-image
Matrix: build-2016-image
Matrix: build-latest-image
Matrix: build-image-variants
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build-image (2022)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
build-image (2023)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
build-latest-image (2024)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
build-image (2021)
The job was canceled because "_2023" failed.
build-image (2021)
The operation was canceled.